Armed Assault Info
ArmA | ArmA 2 | ArmA 3
 

 
  Chernarus Electrical Grid WIP video Editing    
Loyalguard release some infos and a video about his work on Chernarus Electrical Grid on the BI-Forum

The Chernarus Electrical Grid (CEG) for Arma2 is the succesor to Sahrani Electrical Grids (SEG) for ArmA. All of the functionality of SEG has been ported to CEG plus much more! All scripts have been completely re-written to take advantage of scripting features unavailable at the time of SEG's release for A1 and now available in A2.

The scope of the project is to simulate a working electrical grid for Chernarus modeled on existing map objects (no new objects/models). The simulation consists of two power plants that transmit power to various electrical substations throughout South Zagoria. The substations in turn distribute power locally to nearby cities, towns, and other areas.

The simulation's core function is to monitor the integrity (damage and connections) of electrical grid components (power plants and substations) and interrupt "power" to affected areas when integrity is lost or diminished. Power interruptions cause street lamps to turn off (other light sources are unaffected).




Source : BI-Forum
  May 20th, 2010 - 11:09 By Nembo   Comment (1)  

 
 
© 2007 - 2024 Armed Assault Info
Disclaimer - Info