|
|
|
|
|
Loyalguard has released version 1.0 of his CEG - Chernarus Electrical Grid on the BI Forums.
Changelog v.1.0 - 21 Jun 2010 -------------------- -IMPROVED: Easier to find "Trip" and "Close" Circuit Breaker action menu items when near substation transformers by increasing the activation radius. -IMPROVED: Added a world name check to make sure CEG is only activated for missions on Chernarus. -IMPROVED: Power plants no longer emit circuit breaker opening and closing sounds. -ADDED: Added mission maker option to require password to access grid control system. -ADDED: Misson maker option to allow CCTV system to use nightvision during non-daylight hours (time customizable).
CEG itself is only 575K (down from over 700K). The download is 1.43MB only because it has the addon, script, and demo mission versions included. I forgot to delete one obsolete sound file so it will be at least 87K smaller on final release. I still have some tweaks to make but if there are no major problems with this version it will be the release candidate.
|
|
|
|
|
|